How do you perform manual sync in 2Do v3?
Article ID: 627 | Last Updated: Fri, Sep 19, 2014 at 8:35 AM
The new design of v3 does away with the sync button as it’s mostly invisible and automatic now. To trigger a sync manually in 2Do v3, pull the task list downwards and it’ll refresh.
Posted - Thu, Sep 18, 2014 at 11:26 PM. This article has been viewed 11061 times.
Filed Under:
General
There are no attachments for this article.
Can I manage Projects and Sub Tasks with 2Do?
Viewed 55,070.00 times since Wed, Oct 28, 2009
How do I delete a tag in 2Do v3?
Viewed 15,701.00 times since Sat, Sep 20, 2014
How do I defer a task in 2Do v3?
Viewed 9,520.00 times since Thu, Sep 18, 2014