How do you perform manual sync in 2Do v3?
Article ID: 627 | Last Updated: Fri, Sep 19, 2014 at 8:35 AM
The new design of v3 does away with the sync button as it’s mostly invisible and automatic now. To trigger a sync manually in 2Do v3, pull the task list downwards and it’ll refresh.
Posted - Thu, Sep 18, 2014 at 11:26 PM. This article has been viewed 10984 times.
Filed Under:
General
There are no attachments for this article.
How do I drag and drop tasks in 2Do v3?
Viewed 9,945.00 times since Thu, Sep 18, 2014
How do I manually sort tasks in 2Do v3?
Viewed 20,053.00 times since Thu, Sep 18, 2014
Does 2Do support Global Search?
Viewed 15,117.00 times since Mon, Oct 19, 2009
How do I delete a tag in 2Do v3?
Viewed 15,642.00 times since Sat, Sep 20, 2014